We are getting closer to the end of construction. All sidewalks and curbs should be completed this week. This will allow the contractor to clean up around the building and begin placing topsoil in the landscape areas. They will be able to finish grade the site in preparation for topsoil, sodding, seeding and landscaping.
The sidewalk to the Narthex from the main parking lot is complete and the last pair of vestibule doors will be installed. The contractor has started to install millwork around the door frames in the Narthex and kitchen. The sanding of the sheet rock has been completed and the walls are ready for finishing.
In the kitchen, the sinks have been delivered and are being installed. The FRP wall coverings are completed. The stainless steel wall covering behind the stoves has been installed.
In the Parish Hall, the floor polishing should be completed and ready for sealer. Acoustical ceiling work has begun and light fixtures will follow the ceilings. They are starting to install wood trim in the Parish Hall.
Plumbing fixtures are being installed in the restrooms and kitchen. Painting is proceeding throughout the building. Doors amd hardware will be installed shortly.
Weldon Fate, Building Chairman