This week the contractor is going to pour the concrete curbs for the new islands in the parking lot and will asphalt the new driveway and sewer line excavations next week.
We can use the existing parking lot this week, but be watchful of the new islands which will be along both sides of the existing north/south island in the middle of the parking lot. There will also be new parking areas on the north end where the storage shed is located. You will be able to drive on the new paving with care. The new driveway will be opened next week. Take care when you drive in from 123rd Street.
The grease interceptor and sewer line have been installed on the Antioch side of the Church. Weather permitting, the floor slab of the parish hall will be in place this week. Structural steel framing is scheduled to start on Monday.
The playground will be completed by the end of next week.
Remember, drive carefully on the new asphalt and take care around the new curbs. The lot will be re-striped in the near future.