With the snow piled three feet high, there is not much going on outside. The contractor will pour the remaining sidewalks and curbs when the snow melts.
On the inside, the tapers are finishing the Sacristy and painters have started painting there. This will allow the contractor to clean up a lot of the mess in that area. Acoustical ceilings will follow the painting. They will then install the cabinets and doors.
The drywall contractor has completed all drywall and is almost finished with the taping in the Parish Hall. The vestibules in the Narthex should be finished next week. All metal doors have been delivered and are being installed. The wood doors for the Parish Hall and Sacristy will be delivered in the next few weeks. The bathrooms and pantries have floor tile and have been painted. Plumbing fixtures will be installed in the restrooms this next week. In the kitchen, FRP (plastic wall covering) is being applied. The quarry floor tile in the kitchen and pantries is complete. Sinks and sink compartments will be installed in the kitchen this week.
The main sidewalk to the existing entrance of the church will be demolished and redone March 11-13. During this time, please use the Assembly Room door to enter the building.
The sodding, seeding and landscaping will be about the last thing to be done.
Weldon Fate, Building Chairman